Saturday, April 6, 2013

2013 Spring Aeration Progress

After a very dry January, February and March we are finally getting some much needed rainfall and it just happens to be coinciding with our scheduled spring aeration. I have explained on many an occasion that for all of the processes of this job  conditions need to be dry and it almost seems predestined when we schedule aeration it's going to rain. 

These cultivation practices are a necessary evil for turfgrass playing surfaces to maintain the quality we desire. Core aeration is where a core is extracted from the playing surface, picked up and removed, and in the case of greens, a sand topdressing is applied and swept into the holes. This process allows avenues for  necessary air to infiltrate the root system, removes excessive organic matter and relieves surface compaction creating rapid surface drainage. De-thatching is a new process we adopted for our fairways last fall which vertical blades set 3/4" deep remove the thatch which is the culprit of our soft conditions in the summer. This de-thatching or deep vertical mowing is the process that makes the visible lines in the fairways and creates a superior avenue for topdressing sand to work it's way into this thatch layer and dilute it. 

Aerating Greens




Removing Cores


Sweeping in Topdressing










A full inch of rain fell  on Sunday 3/31/13. The course took this amount of rainfall eagerly however conditions were too wet to get started on the practice greens the next day, Monday 4/1. The following day we were planning to finish up with all of the greens but conditions were still wetter then ideal making our process slower then normal. We had a back nine closure scheduled the following day, Wednesday 4/2 and perfect weather so we were able to finish the remaining greens and aerate, de-thatch and cleanup #10, #11, #12, #13 & #15 fairways.


Deep vertical mowing in process. This is the second time
Granite Bay has undergone this process. I feel this is a
superior method to removing thatch or organic matter
from our fairways as compared to core aeration because
of the greater volume of thatch removed, better avenue
of working sand topdressing into the surface and a much
cleaner finished product.







Close-up of the actual blades that cut into the surface 3/4"
deep and bring up the thatch. 





























The next day Thursday 4/3 rain had been fore casted but it wasn't raining in the morning at 5:00 AM and we had a scheduled front nine closure. So we went ahead and got started de-thatching and aerating #1 fairway and then it started to rain lightly. It never really poured but it doesn't take much to make a real mess and nearly impossible to mechanically pick up the thatch that is laying on the ground getting wet. We ended up having to remove a  large portion of the extracted  material with rakes and shovels. Good times.

Air in the rootzone is necessary  for fairway playing
surfaces as well so we are punching holes with solid
tines just ahead of the deep vertical mowing process. 



Removing extracted thatch with sweepers, an impossible when wet.



We will get a few fairways done today Friday 4/5, grind out a long day on Monday 4/8 and be right back on schedule weather permitting. We still have two alternating closures next week on Tuesday and Wednesday to core aerate the green surrounds and approaches so by Friday 4/12 we will have completes aeration on all high impact areas that are difficult to do during member play namely greens, fairways, green surrounds and approaches. This completes this job in nine working days utilizing five alternating closures and a completely closed Monday to aerate, de-thatch 3 acres of greens, 28 acres of fairways and 10 acres of green surrounds and approaches. Without the additional 3 alternating closures that we adopted a year ago this same amount of work would have easily consumed 20 working days and an intangible amount of distractions to our members and guests.




Removed thatch waiting to be picked up on
#9 and #12 fairways













Completing these high impact areas by next Friday 4/12 will allow us to work  on tees and rough through the last two weeks of April. These areas are easier to work on amidst  member play as we can shift tee locations around and work aerating and cleaning the rough much easier then fairways and green surrounds.


Removed thatch from fairways. After a few years of composting it can
be returned to the golf course as an organic nutrient source.

Aeration needs to be a scheduled event. We plan events and and associated staffing around aeration in all departments of the club. Members obviously schedule their golfing time around aeration. What I am getting at is we have to set these dates and adjust to the weather that befalls us. With this in mind a collaborative decision between GBGC Management and the Golf Committee to move our spring aeration dates back to the second week in March starting in 2014. The upside's are we will potentially be farther along if not recovered by the end of April which is a much more desirable time of the year for golfing and non aerated playing surfaces. Getting the greens punched earlier and subsequently healed earlier might bypass some of the springtime inconsistencies we can experience with  the poa on our greens "waking up" earlier then the bentgrass. Downsides with earlier aeration scheduling can be a heightened readjustment to the weather as March is historically wetter and cooler then April along with the associated slower recovery. It will be worth a try as it seems like we have to re-adjust to weather conditions to some extent in April anyway. Thank you all for your understanding and support. 


Tuesday, February 19, 2013

2013 Winter Progress

Our great game is an outdoor game constantly subject to the whims of nature and weather. I think this is part of its charm, it greatness. So yet again the weather dictates our path for maintenance, as well the surface conditions. As the chart indicates below the winter of 2012 - 2013 has been as strange as any other. Close to records amounts of precipitation in November and December followed by more freezing cold weather then we have seen in years. Now midway through February we have recorded a tiny fraction of normal rain with nothing substantially forecast in sight.

Granite Bay Golf Club Historic Rainfall                                                    
                     Jan   Feb   Mar  Apr May Jun  Jul  Aug  Sep  Oct  Nov  Dec     Totals
2013 0.71   0.01                                                                                                 0.72
2012 3.76   0.62  6.74  4.45  0.08  0.15  0.00  0.00  0.00  0.42  6.99  7.91      31.12
2011 1.73   4.89  7.70  0.36  2.75  1.43 0.00  0.00  0.00  4.13  0.89  0.17      24.05
2010 5.63   0.92  1.94  3.60  1.38  0.06 0.00  0.00  0.00  3.08  3.61  7.67      29.89
2009 2.03   4.91  2.20  1.25  1.84  0.20 0.00  0.00  0.13  1.53  0.70  3.58      18.37
Historic         4.30   3.50  3.90  1.90  0.50  0.30  0.10  0.10  0.50  1.60  4.00  3.50      24.20
Average


Frost delay were common place this winter with a stretch of
16 day straight where we had frost delays this year

The golf course is more off color then past winters primarily due to the amount of freezing weather and frost we experienced in January where we had 16 straight frost delays. Frosty cold weather is  usually associated with dry weather and  because nothing is really growing when its cold like that we get the kind of surface firmness that make for great golfing conditions. It is very unusual to do so in February but we have had to water the golf course 4 times this month where we usually don't even think about it.


Winter Projects
The lack of rain does help with winter project progress as wet sloppy weather is always a hindrance. As planned we started after the first of the year on pruning the overgrown screen of shrubs along Barton Road.  Unfortunately this mass of Photinia and Acacia had had little attention since being installed in the late 1990's and this are not the kind of  plant material that does well with no attention. We ended up removing the Acacias which were brittle, split falling over and we cut back the Photonia as far back as we dare. Our intention was not to open up this massive hedge as much as we did, it was just one of those situations that a little "pain" was necessary so we have a manageable situation moving forward. The Photinia (this is that super common hedge that has the bright red new foliage in the spring)  will start it aggressive spring push shortly and recover some of the exposed openings as well as some fresh plantings of multi-stemmed Live Oak to fill some of the holes left by by the removal of the Acacia.

Re- establishing the walking only path in front of the #17
tee in January















Walking path completed after installing new fine fescue
sod. This was the  original design intent of the hole and
grew into a short cut for carts over the year's. We now
insist cart traffic follow the cart path around before
entering the #17 fairway.


















After finishing the Barton Road pruning we started working winter projects on multiple fronts. First we started some of the same irrigation work we have done in the last two winters where we improve coverage in areas that we know struggle in the summer months requiring inordinate amount of hand watering. This is the most exciting work for us because of successes the additions have provided everywhere we have completed them in the past. It is this behind the scenes, underground kind of stuff that  make a huge difference in our goal of making Granite Bay firmer up the middle in the summer months as we can focus our hand watering efforts there.

Irrigation coverage enhancements in progress. Some of
the most important work that can be done to this  golf
course continues.
What kind of winter season would it be without re-claiming some of the encroaching native brush  and cleaning it up. As planned this year we are working on the  left hand side of #13. Opening up this area will provide much needed air movement and light to the turf along the left side of this hole primarily up towards the green where the cart path makes a left. Turf in this area struggles in the winter from low light and never really gets good due to a bottle neck of cart traffic and our inability to rope the hole off for traffic control due to the difficulty of navigating the steep, often time's wet bank. Thinning the area out will provide a better look at the green if you happen to end up on the left, which hardly ever happens, but strategic trees will remain and have to be accounted for .

Working on  clearing and pruning to the left of #13.
This area will be completed towards the end of February
Other winter projects that are just wrapping up is landscaping the new Granite Bay Teaching Academy. Another maintenance project in progress is replacing missing yardage markers on sprinklers heads and raising the low heads and valve boxes in the fairways. We also pledge to be more consistent in keeping these marked heads clean so players can utilize the yardages. Yardage plaques are also being moved as we have determined yardages are way off in some cases.

Granite Bay Teaching Academy landscaping in progress












Sprinkler trimmed and labeled waiting for a yardage
marker replacement.























Capitol Golf Course Projects
Granite Bay received a generous amount of capitol funds to improve the club in 2013 and there are many Golf Course projects and improvements that have been pre-approved and are now going through the final  funding allocation process. Project's such as aeration systems for both of our golf course ponds that will be a big step towards water quality and clarity. The irrigation work that I spoke of above has been fully funded for every area on the golf course that  we have identified. This is huge along with the future commitments to upgrades and modernization of the most important infrastructure system we have at the club, our irrigation system.

New state of the art triplex greens mowers  part of  our 
Capitol allocation.
Re modeling of the  ladies course restrooms is a high priority along with more lighting to illuminate the rocks in front of the 10th tee. This is more of a ambiance issue for the clubhouse but we have to trench through parts of the golf course to do it. New ball washers are coming as well as new practice area netting all with the goal of making the club more relevant and the home away from home that our members can be proud of. And I haven't even mentioned all of the fire pits, new seating and  Bocce Ball Court that are in process for the clubhouse area along with painting and woodwork replacement. 

We will provide details and progress reports as we go through the process of these improvements in this very exciting time at Granite Bay Golf Club.

Warmer weather  greener grass and trees are just
around the corner.

Friday, December 14, 2012

Storm Damage & Curbing Progress

Many of us are aware the granite Bay Golf Club is fortunate to have our own weather station that constantly records weather data which is used in calculating a ET or evapotranspiration rate. The weather station recorded data from a fairly decent winter storm which started on November 28th and did produce some damage at the club. Here are some data comparisons  to last year.



Left hand bunker #18 full of silt from flooding that occurred
 adjacent to the lower cart barn the morning of 12/2/12.  This silt
had to be removed by hand prior to raking the trap to prevent
sand contamination. Once the storm subsided the bunker
completely drained.


Rainfall Totals YTD 2012 - 26.79"
Rainfall Totals 2011 - 24.05"
Rainfall Totals July - YTD 2012 (rain season July - June) - 10.99"
Rainfall Totals  July 2011 - June 2012 - 16.61"
Rainfall Totals  October 2012 - YTD - 10.99"
Rainfall Totals October 2011 - December 2011 - 5.19"




Interestingly the October through December comparisons recorded over twice as much rainfall this year then in 2011. Over 7" of the 10.99" that we received since October this year fell in a 8 day period between November 28th and December 5th. The weather station records hourly data and on Sunday morning December 2nd we recorded .90" of rain between 8:00 AM and 9:00 AM. We believe the vast majority of this .90" actually occurred between 8:30 AM and 9:00 AM in a deluge that did cause some problems at the club.

Storm damage to #5 fairway bunker awaiting repair. 


Our lower cart barn took on some water along with Tilleys and Kevin had to spend the week drying out golf carts which are now up and running, no worse for the wear and Mark had carpet drying to do. The sandtrap's for the most part had no standing water in them which is a testament to the drainage system. The flash flood did compromise the liner in some traps and caused some damage. The purpose of a bunker liner is to prevent contamination of the native soil with the sand in the bunker preventing discoloration and percolation of the sand. 



Above storm damage repaired with an
polymer / fiberglass infused
decomposed granite.
Only one tree casualty behind #8 green. 

Our plan to repair the damaged areas in the bunkers in #5 FW, #6G front, #12 FW is to patch these areas with a special polymer and fiberglass infused decomposed granite that we will pack into the compromised areas, let cure and replace the contaminated sand. This "bunker patch" material had to be made in dry conditions so we have just received a load and plan to start the repair process today, Friday 12/14/12. Next year in the spring or summer when conditions are dry we plan to re-spray our polymer liner over the patched areas which we hope will be a good recipe to fixing these issues in the future.

Green and Tee Curbing

As promised I wanted to provide a quick update on a project that anyone who has been out on the course playing the past month have noticed, and that is the curbing project  which we are just wrapping up. Firstly I want to apologize for not communicating the purpose and process of the project as thorough as I should have. I am keenly aware that the project has raised some eyebrows although I am confident that the finished product will not be an issue and vast improvement over stakes, chains and blocks in high impact areas around certain greens and tees.

#1 & #10 Tee Complex without the plastic blocks

Although this project was approved early in 2012, we got started on it later then originally planned and we need to complete it before the end of the year or lose the funds and have to go through another approval process. The purpose curbing in these high impact areas are to prevent the natural wear of turf along the cart path where players in golf carts instinctively pull over slightly to approach the green or tee. Repeated traffic in these areas produces worn out ugly turf which unless prevented can turn into ruts and mud holes. Traffic control measures prior to curbing were stakes, chains and blocks which  these new curbs will replace. 


Colored curbing during the finishing process






GB GCM personnel finishing curbing
             

Adding soil during the back-up process at #5 green
Having to complete the project before years end has not allowed us to "back up" the curbs as we go, which has probably caused the most questions as members are not seeing the finished product. Backing up these curbs is simply the process of filling the turf side of the curb with soil to grade and replacing the sod. This will create a easy transition to navigate by foot or with a push cart. The curbing has been designed with ADA  regulation's in mind  which requires reasonable access for potential disabled players. These access points will accommodate players with push carts that don't want to navigate the curbs. By the end of Friday 12/14/12 we will have backed up curbing on #2, #4 and #13 greens.



Replacing the sod during the back-up process #5 green.

The concrete pouring portion of the project will be completed next Tuesday 12/18/12. By the end of next week we should have all of the installed green side curbing backed up weather permiting, and by the end of the following week we should have all of the tee side curbing backed up. Some of the early curbing we poured did not have color in it. Subsequent curbs have been installed with color in the concrete and the  early curbing that doesn't quite match will be acid stained once properly cured and the weather is right. 





#5 green finished product



Thank you.

This will be the last course update of the year and on behalf of the Granite Bay Golf Course Maintenance team I would like to thank the Membership for their support of our efforts. This game played  on a living, breathing, evolving surface requiring both a scientific and artistic approach and most importantly, a collaboration between Members and we who are here to serve them. We are grateful for you generosity and patience as we continue to endeavor enhancing this great golf course which is Granite Bay. 

Merry Christmas and Happy New Year 



Friday, November 30, 2012

Tis The Season To Do Projects

Although we'll have some wet weather to maneuver, the late fall and through the winter is the best time to get projects done on the golf course. This is primarily due to turfgrass needs being minimal once the days have gotten shorter and cooler and we don't have to irrigate or mow as frequently. 

Forming curbs along #4 tee. This is a four week project
we need to complete before the end of the year.
We have a list of projects longer then our ability to complete with some of the usual suspects and some new for Granite Bay. New for Granite Bay and immediately following Thanksgiving we are going to start a curbing project along small sections of cart paths, primarily near tees and greens. Golf carts, as we all know, are a big part of modern golf and can be detrimental to the turfgrass playing surfaces making traffic control a necessity to protect the turf. Currently we employ an assortment traffic control measures including stakes & chains and those hideous 4 X 4 - 18" high plastic blocks on a spike along green and tee cart path edges to protect the turf from a cart drivers natural inclination to pull over when parking.

Shoveling concrete into the forms.















Covering the newly poured and finished curb #13 green.
Rainy weather is something we have to deal with while
doing projects at this time of the year.
















These stakes & chains and blocks on a spike are marginally more attractive then the wore out turf they are in place to protect, hence the need for curbs. Admittedly this project is more about aesthetics then it is about playability although protecting turf along paths near greens is definitely a playability concern, not to mention eliminating the obstruction of the current traffic control measures. I will provide details on the process which gets started in earnest on Monday, November 26. We have four weeks to complete the project so it will be an all hands on deck effort. Thanks in advance for your patience and understanding.

Other projects that we have slated for the late fall of 2012 & winter of 2013  is the always well received pruning and clearing along with more irrigation coverage work. Additionally we have some diffused oxygen diffusers or bubbler's are slated for installation in both the irrigation pond between #1 & #9 and the pond in front of #3. These oxygen diffusers will add oxygen to the ponds and substantially help with the ponds biology and water clarity particularly in the summer months.

Painting the perimeter fence on Roseville Parkway
between storms.





Friday, October 19, 2012

2012 Fall Cultivation

Autumn is a favorite time of the year for most golf course turf programs in our area particularly if they are managing predominantly cool season turf. The vast majority of the turf varieties here at Granite Bay are of these cool season varieties and these types of grasses will always perform much better when it is cooler hence the classification. Cool season varieties actually start to vigorously grow again after a slowdown during hot weather along with a natural rejuvenation which makes this time of the year one of the best times to cultivate and help this rejuvenation process along. 

We have many different ways to cultivate turf on golf courses and have addressed many of these cultivation processes in past course updates. The two most frequently used cultivation techniques utilized by turf managers include Aeration  and  Vertical Mowing. There are many different ways to aerate or vertical mow utilizing many different pieces of equipment that are specialized for different areas of the course like putting surfaces or fairways. We tried a new cultivation technique on our fairways this fall that I think will be very beneficial moving forward.

Removing thatch #11.
The unique fairway situation we have here at Granite Bay has been addressed in the update "Why We Get Wet in the Summer". In short we have different grasses in our fairways with a large percentage of  the turf being bentgrass. Bentgrass by nature produces a very dense and soft thatch layer below the turf leaf surface that literally acts like a sponge. This thatch layer is what makes Granite Bay soft in the summer and incredibly difficult to irrigate. We spend allot of time and effort in Irrigation Management yet overall firmness in the summer continues to allude us. The culprit of this softness is this bentgrass thatch and the solutions are not without some sacrifice. 

The new cultivation tecnique that we just concluded has promise in the removal and dilution of this thatch and I am optimistic can be very beneficial to our fairways. Core aeration has always been our traditional method of removing thatch in the fairways. That process removes a core of  turf and thatch along with  soil and roots which is allowed to dry and are then picked up after chopping and dragging and vacuuming up whats left. We remove some thatch in the process but but the holes produced  become clogged up during the above mentioned cleanup and difficult to get our new founded allotment of topdressing sand into. This new allotment of sand should technically firm these surfaces up in time but we need to get the sand into the thatch layer to dilute, firm and facilitate further biological breakdown. 

Deep slicing to a depth of 3/4". We feel this process removes
more thatch while facillitationg sand and seed  along with
being less disruptive then core aeration.
















Harper verticle mower in action removing spongy thatch
only, no soil.















Therefore we tried a different process this fall which is a form of vertical mowing. Vertical mowing remember is the cultivation procedure where verticle blades actually slice into the turf canopy removing thatch in the process. Getting down deep enough to actually thin out this spongy thatch required a new piece of equipment that worked very well. The process removed over twice as much organic matter then core aeration and no native soil so the cleanup process was  much quicker allowing us to get sand and seed down directly after cleanup and into the narrow slits effectively diluting the bentgrass sponge layer. After going through the entire process, I believe it is a superior way of thatch removal for our fairways as opposed to core aeration. Punching holes to provide air in the root zone is necessary and beneficial for our fairways however can be achieved with solid tine aeration in conjunction with this new deep vertical mowing. Again I really think this procedure can make a diffrence with what I would considor less disruption and quicker recovery.

Cleaning up the mess











Applying topdressing sand immediatly after cleanup of
the deep verticle mowing.











Weed Control
Directly ahead of our fall fairway cultivation we sprayed out a weed called Knotgrass (paspallum distichum) which has been encroaching in certain areas of the course for awhile. Currently there are no good selective control products available for Knotgrass, (herbicides that remove the weed and don't effect the desirable grass) and we should know as we have tried a number of them over the years. The Knotgrass encroachment reached unacceptable levels this summer so just prior to fall cultivation we treated the areas of encroachment with a non selective product (herbicide that kills vegetation indiscriminately). The treated areas are  currently very noticeable but have been seeded and will in a short time fill in with desirable          turf. It is currently the best season for germinating seed hence our timing of treating the Knotgrass just prior to cultivation. 

Closeup of Knot Grass (paspallum distichum). This is a perrenial
weed that will come back every year from dormant roots and
cintinue to spread.














Spot treated fairway in an attempt to selectively control
Knot grass with an experimental product. The combonitation
experimental product worked better in the desireable  turf
so we treated with a non selitive product and followed up
seeding.












Putting Surface Aeration
Two weeks ago we completed the 5th aggressive aeration to the putting surfaces. Since employing this aggressive procedure in the fall of 2010 the surfaces have improved however have not been with out issues. On the improvement side they have gotten firmer and recent physical soil analysis has shown that air pore spaces vs. water pore spaces in the top 3" have moved from 4 to 1 respectively to 2 to 1. Ideally we would like to get to 1 part air to 1 part water holding as far as soil pore sizes are concerned in the top 3".  These changes are due to the aggressive core aeration we have adopted which removes excessive organic matter and dilutes the profile with mineral sand. The goal of a 1 to 1 ratio is achievable considering the movement that has been made in two years . Setbacks this past year were  root disease issues that still have a link to organic matter and its moisture holding capicity so continued diligence in core aeration is a must. Additionally the bad batch of sod and the rush job in which we replaced the perimeter of #14 green awhile ago is not acceptable so we are replacing it with thick cut homegrown nursery sod this week. At some point we just have to  literally "cut" our losses. 
Continued agressive core aeration will be the key to getting
the putting surfaes at Granite Bay performing the way we
all want.

Friday, August 3, 2012

The Dog Days of Summer 2012


"The Summer Demands and Takes Away too Much."
John Ashbery


The  Ancient Romans who associated the Dog Days of Summer  with the rise of the "Sirius" or the "Dog Star". According  to Wikipedia they even sacrificed a brown dog in an attempt to appease the rage of Sirius believing the star was the cause of the hot, sultry weather. Although my research has led to differing dates of the "Dog Days", I consider them right now, the next 50 days between the beginning of August till the Fall equinox in mid to late September. 

These are the days  that the cool season turf at Granite Bay  can start to fade and thin in areas. The time in which certain opportunistic weeds start to emerge and take hold and disease pathogen's thrive. The time in which the bentgrass in our fairways start to get soft and the hybrid bermuda on our tees thrive. In short,  the Dog Days always have been, and always will be the most stressful period for this golf course requiring an all hands on deck approach to get us through with a minimum of casualties.

Irrigation Management Improvements 

Granite Bay GC weather station.
Our own weather station which collects hourly / daily
high / low temperature readings, humidity, wind speed and
solar radiation (Langley's)
Thankfully so far the summer season of 2012 has been fairly mild. We have had three periods of triple digit temperatures through July but they have been followed by cooler weather ushered in by the delta breeze and most importantly low evening temperatures. This type of weather certainly makes the battle easier, but we still have cool season turf  that would prefer maximum temperatures in the 80's growing in heavy decomposed granite soils. We still have to irrigate nightly and although we have great water quality to irrigate with, it still does not readily move through the heavy native soils. This requires an intense micromanagement of the irrigation system that I believe our GCM staff has gotten much better at and with future infrastructure improvements can improve even more.

Granite Bay of course has an automatic irrigation system which has a central computer that assimilates  weather data provided by our weather station and in turn calculates a  irrigation replacement quantity based on what is known as an evapotranspiration rate. This central computer has a software program called Cirrus which has a myriad of ways to apply this calculated ET rate to the site specific areas of the course. But it is not as simple as turning on a switch and letting the computer take care of everything. On a golf course there are  different types of playing surfaces, different species of turf and different sub and micro climates. Examples are shady area's  versus a south facing  hot bank's or hillside's. Topographical differences of a mound versus a low lying area of a fairway along with  different native soil types on one property and the modified soil types (sand blends) of the greens and tees are examples as well. All of these micro climates have different irrigation requirements that have to be taken into consideration. Sometimes the same irrigation heads or stations cover adjacent conflicting areas that have distinctly different irrigation requirements. All of this necessitates an intense micromanagement of the irrigation system. 

Screen shot of  "program detail" from our  Rainbird
Cirrus Central irrigation Computer located in the GCM offices.
This central computer is the brains of the irrigation
system and is where all run times are calculated,
adjusted and started.
Therefore one of the best management practices we have developed for Granite Bay, and are continuing to fine tune are daily individual station adjustments to the  automatic irrigation stations and heads throughout the golf course. Through the Cirrus software in the irrigation computer we can manipulate percentages of ET up or down based on conditions on the ground of individual stations and heads. In extreme situations where an area has become over wet or dry we can temporarily adjust the station up or down or off for a specified amount of time again based on these conditions. Stations are grouped in the software by golf course nomenclature such as greens, tees, fairways and rough and are put in programs that can be adjusted by area type and hole as well. The first line of micromanagement of the system is making these adjustments on a daily basis based on that days conditions. 


Jogi making daily irrigation adjustments to individual
stations and sprinkler heads via an IPad
















IPad connects to the central Ranibird computer
wirelessly allowing for efficient, real time changes
 on the course exactly where we need them. 
















We typically maintain program averages within Cirrus below our the ET rate that is calculated by the weather station. At Granite Bay we have found that  maintaining these percentages at the calculated ET rate results in undesirably wet conditions. Running programs below the adjusted ET rate necessitates the second line of irrigation of micromanagement, hand-watering. We have made a tremendous amount of infrastructure improvements to the irrigation system the past few years improving irrigation coverage and have more planed in the future. All of these changes have improved conditions throughout the course and have taken the strain off of our hand-watering regimen. That being said there will never be a substitute for a man on a hose. Irrigation systems at best can be 60 to 70 % efficient as compared to rain and if we purposely water below adjusted ET rates to avoid overly wet conditions at Granite Bay we must supplement with guys on hoses putting water exactly where it is needed.


Hand watering is the backbone of  micromanagement
of the irrigation system. There is no substitute for a
guy on a hose

Screen shot of our weather / irrigation tracking
which showing 2012 YTD water usage below the
adjusted ET rate. In the past when this line has been
closer or even over the ET rate the course has
been too wet.

Watering Putting Surfaces based on Volumetric Water Content

Another industry wide best management practice is the use of moisture sensors to determine volumetric water content or VWC and irrigating based on this data. The use of property wide VMC as a substitution to ET based program's could change the way we look at irrigating golf course turf but are still aways off from perfection.  However the use of hand held meters checking the VWC of putting surfaces has been noted as a best management practice by the USGA Green Section for some time. We have been using a Spectrum Technologies Field Scout TDR 300 soil moisture meter diligently for the past couple of months and are starting to experience good results from it's use. We check the putting surfaces in the morning and record VWC averages and note highs and lows and hand water and adjust individual heads according to the data we collect. Additional readings are taken in the afternoon giving us further data to work with. We started using the meter in reaction to inconsistencies and a nagging pythium root rot issue. Even though the daily use of the meter has added to our maintenance program, I believe that the data collection and adjustments based on  this VWC data will be a big help with surface consistency and health moving forward.

Gama checking and recording VWC data.
This has become a every morning task.
















Spectrum Technologies Field Scout TDR 300
soil moisture meter.






Granite Bay's Irrigation Future

We have many plans for the future having to do with the irrigation system. We hope to finish all of the irrigation coverage issues this coming winter. When Mitch works his magic with corporate and gets the capitol funding we submitted released early,  we will be off to the races this winter and will get this work completed before we start irrigating in 2013. As I have stated many times before, without exception every place we have completed this irrigation enhancement work has resulted is superior turf and a much reduced need for labor intensive hand watering. Secondly we have some irrigation as-built mapping to take care of that will give us the kind of information we need for further 2014 irrigation enhancements which will give us single head coverage enhancing even further our ability to micromanage. More on this to come.

Given the importance of irrigation here at Granite Bay all of these type of improvements will help us micro-manage the irrigation system creating better conditions in the future Dog Days of Summer. And the one thing we can count on every year is that the Big Dog will be back.


"I purpose to fight it out on this line if it takes all Summer."
Ulysses Simpson Grant 1869







Friday, June 22, 2012

The Summer Solstice at Granite Bay

"Summers Lease Hath All To Short A Date"   William Shakespeare





I'm not sure I agree with Mr. Shakespeare analysis of summer as we try to provide firm and somewhat fast  cool season turf grass playing surfaces alive in the Sacramento valley. Nonetheless this past Wednesday June  20, 2012  marked the first day of summer in the northern hemisphere, the longest day of the year and the beginning of the most stressful period for the turf at Granite Bay golf club. This 94 day period until the fall equinox on Saturday September 22, 2012 is when our "hemisphere receives more direct rays from the sun then the southern hemisphere where it is winter. In the winter, the suns energy hits the earth at oblique angles and thus less concentrated. During the spring and fall the earths axis is pointing sideways so both hemispheres have moderate weather as the rays of the sun are directly over the equator." Matt Rosenberg - About.com




As most of us are aware this is the  period in which the course is most at risk and can struggle. Our irrigation system  improvements over the past couple of years has made a big difference so far. Our hand watering regimen and continued focus on daily irrigation adjustments have paid off as well but the upcoming 94 days will really tell the tale. We have not received too much  really hot weather so far and will keep our fingers crossed, light a candle and say a prayer that the summer would be kind and our continued diligence steady. 

Summer Putting Surface Aeration / Spiking

This coming Monday June 25, 2012 we will be spiking the greens with 1/4" hollow tines and applying a very light topdressing of sand. The process will have a minimal if any effect on putting quality along with being very short lived. The benefits include removal of an additional 4% of thatch from the putting surfaces along with providing avenues for soil oxygen for plant transpiration or cooling down. Forcasted temperatures are supposed to be mild making this a great opportunity going into summer. 

Below is a video entitled Aeration: A breath of fresh air from Pace Turf. The principles and benefits described in the video apply to the aeration / spiking event we have planned for Monday  however we do not have an aggressive event planned and it is worth repeating will not effect putting quality for any length of time.