Friday, March 25, 2011

Progress & Preperations

I think part of the greatness of this game of Golf is that the surfaces we play the game on are ever changing. They change from year to year, season to season and even  day to day. They are constantly being either nurtured or attacked by whatever weather patterns nature has in mind. Its part of the game, part of the experience, part of the challenge. Preparing and maintaining consistent surfaces is something we are charged with as greenskeepers. We mow and roll and punch and sand and spray in search of that elusive "consistent  consistency". We are all want surfaces that are green, alive, fast, firm, smooth and dry but this wet winter keeps getting in the way. Currently the calender says it is springtime but it still feels allot like winter to me. Hopefully the real spring will  show up as forecasted next week and give us a taste but then it might retreat again. We only know  that spring will be here and behind it the  demon summer.

#3 green during a recent storm Thursday 3/24/11
Rainfall accumulation is measured by weather people from July to June. Using those parameters the weather station at Granite Bay Golf Club has measured 27.23" of precipitation to date in the 2010-2011 rainfall season. Compare that to 13 inches in the 2009-2010 season. And we are most likely not done yet this year. Obviously this type of weather affects the consistency of the surfaces. It affects what we can do to produce consistency, speed etc. It also affects our preparation's. We cant aerate, top dress, roll, we cant even mow when it is  this wet. It's just the reality of our current situation that could change rapidly. So as we make plans, and as I outline them below, keep in mind things could change. We have to be able to adapt to "conditions on the ground" to use a military metaphor. Its all part of this great game, the game you love playing, the surfaces we love preparing and this place Granite Bay we all love calling home.


Hail at GBGC Monday 3/21/11






















Preparations

In two weeks we start the aeration of the golf course. Core aeration is what we will do to most of our surfaces this spring. In review this is the process of  removing plugs of turf providing air passages for necessary oxygen to the root zone. Additionally core aeration relieves compaction, allows for rapid surface drainage and most importantly for us, removes  part of the accumulation of thatch which has become excessive on most surfaces at Granite Bay. Below is a tentative schedule, weather permitting.

Week of April 4th - Putting Surfaces
Week of April 11th - Fairways & Tees 
Week of April 18 - Fairways & Tees
Week of April 25th - Green Surrounds
Week of May 2nd - Green Surrounds
Week of May 9th - Rough
Week of May 16th - Rough

Putting surfaces will be aerated aggressively like last fall using 5/8" holes on 1x2 centers displacing 10% of the surface area. Greens will be heavily top dressed as usual. Fairways will be core aerated and de-thatched. The fairway procedure will be the one that will require coperation between  golf course maintenance and players because the cores that are removed must be dry in order for us to pick them up. There will be times when cores, and remnant's of cores will be  present and  players will need to take relief from them while we are in the process of cleaning them up. If we could do the process at night we would, but as I explained above, we need drying weather to complete the task. Green surrounds and rough are similar to the fairway process,  we can and will punch holes early before you players begin  but we need  the drying weather to remove the plugs and clean up. We wont do the whole course at one time so it will be selected areas that we will have to work together on during the process.


Aggressive core aeration to the putting
surfaces last fall

Core aeration of #15 fairway last fall. These cores need to dry before we pick them up















We will work around Monday events and strategic afternoons and get a good proportion of these tasks done when member play is light but inevitably some of it will have to be accomplished during play. This work has to be done and it has to be done in the springtime when the weather is temperate. We will be poking holes in the summer ( more on that later) but the holes will be small and non disruptive so they don't effect playability and  further expose the turf to summer extremes. This necessary evil can be painful but a big part of our potential sucess.

Progress

Even though this winter has been wet, we have been able to make great progress on the goals we set for our department. Those goals were:

  1. Continued Fairway Bunker Renovation
  2. Brush Clearing and Pruning
  3. Irrigation Enhancements
Bunker renovation could only be done when the weather was dry although we pushed the envelop on occasion. Out of the 20 on course fairway bunkers we have completed 11 since we started last fall. We currently have 9 on course fairway bunkers to complete and with a clear week forecasted next week we plan to push and complete the 3 fairway bunkers on #10. This will leave us with 6 left to do, #5, #6 & #9 on the front side. Along with  #13, and 2 on #15 on the back. Our goal is to complete all of these fairway bunkers by early June.

Filling fairway bunkers ahead of a storm on #4
I think we made great progress on brush clearing and pruning as well. On the pruning front the maintenance staff worked from the ground by pruning up many trees around greens that struggle with shade issues namely #7, #13, #16 and the large practice green. Next week we have a arborist, Dave Mullen from Golden State Tree Care that is coming out to remove some more branches up in the trees in these areas, creating more light. My plan is to annually do some work to these trees to not only keep them healthy but to continue to allow more light to shine on the turf. In the following weeks, Dave is going to spend some time working on trees that are getting close to making the fairway unacessable from the tournament tees on #15. Visibility of the fairway has long ago been obstructed by these trees so we need to get at them. Dave gets opportunities to play the course as a guest on occasion and plays from back there. He told me he has been chomping at he bit to get into those trees for awhile.


#10 Tee March 2011




#10 Tee December 2010



















On the clearing front we made great progress as well. Willows on #1 and #9 obstruction tee and approach shot were pruned down early in the year. And recently we started work in front of the #10 tee opening up the periphery and exposing some of the most beautiful rock formations at Granite Bay. Additionally behind the ladies tee on #1 we did some clearing and mulching exposing more rocks and enhancing the view from the MacKensie Grille. Night lighting was installed in these areas years ago to illuminate golf course features enhancing ambiance from the dining room.


MacKensie Grille before view #1 bridge

MacKensie Grille view of in front #10Tee

MacKensie Grille after view #10 bridge















Irrigation work around the greens is complete. We have what maintenance considers 21 putting surface surrounds at Granite Bay, 3 of them are the practice areas, large PG, small PG & the chipping area. Of these 22 green surrounds we addressed  11 of them this winter, some of the work was substantial. In 2010 we addressed 6 of these areas and will address the chipping area later this year. This work was on our list of goals because it was important.   The heavy lifting is now done and I am confident that what we completed will be a part of our overall strategy for summer success in 2011 and beyond.


Recent irrigation work along path #18
Hopefully everyone has had a chance to check out the new divot mix and divot bottles that were made by Granite Bay's own craftsman extraordinaire Kevin Schumann. Par three divot mix boxes are out there along with divot bottle boxes containing cart and walking bottles  on every other tee. Water station containers are currently in the shop and will be out on the course re-sided with IPE wood next week. And for those of you that notice the plastic scorecard boxes on #2 & #11 standing out like a sore thumb next to our new wooden cabinetry, don't worry, Kevin is making replacements for those as well. Additionally we realize that some signage is necessary even though we keep it to a minimum at Granite Bay. That being said some of our signs have gotten pretty ugly over the years and need replacement particularly the slippery when wet at the bridges and required environmental signs.  Look for replacement of all of these signs soon.

Kevin re-siding our water cooler stations



New Divot Bottle Boxes with soon to replaced scorecard holders















We actually feeling pretty good about our progress this past winter and are optimistic about a successful summer as well. It would be a fib if I said I cant wait for the demon summer to arrive, however we have made our plans and we have made progress. Come what may, we are ready. Thanks as always for your support.






Wednesday, February 16, 2011

February Progress and Preperations for 2011 Season

I don't recall a winter with as varying  a weather pattern as this one. We have all seen plenty of wet or dry winters where certain patterns predicate course conditions but in 2011 so far we've experienced it all. Record rainfall in December  saturated the golf course taking almost the entire  month of January to dry it out. And now midway through February, traditionally our wettest month of the year, we are just getting our first  series of storms. Looks like February could finish on the wet side with storms forcasted through the next ten days.


Completed Fairway Bunkers #12
We took advantage of the lack of rainfall in January to make progress on bunker renovation. We had to stick close to the cart paths because the course was so soggy that transporting materials across the wet fairways would have made a mess. This allowed us to tackle the three bunkers adjacent to the path on #12 and with the weather cooperating the crew completed all three. We are putting the finishing touches on the left hand fairway bunker on #17 which only leaves us 11 fairway bunkers to complete on the course. We can definitely see allot of light at the end of this long tunnel.

Completed Fairway Bunker #18 with Greenside Bunkers
Continued progress was also made in January through the first part of February on another of our major 2011 winter goals, irrigation enhancements around green complexes. Any one who has been playing during this time period has probably come across us moving, adding or even removing sprinkler heads around the putting surface areas. We have addressed every hole on the front nine to this point and are currently getting ready to start with some work around #13. Improving irrigation coverage allows us to actually reduce irrigation run times in certain areas as well as reduce, not eliminate, the need for hand watering in these areas. I'm confident we'll really see the fruit of this work paying off this coming summer.

Irrigation Work in Progress Behind #12 Green
Speaking of summers, recently some members of the Granite Bay Golf Committee took some excursions to  local golf courses to check out their dormant bermuda playing surfaces. These trips were motivated by comments we seem to get every Summer regarding Granite Bays softer fairway conditions as compared to other courses in the area. The purpose of these trips was to get a feel for these bermuda surfaces when they were dormant to ascertain from a members standpoint if this was a viable option for the future.


Dormant Bermuda at Northridge


Before I go any farther let me state that our budget and plans for 2011 are set. I wrote allot about thatch removal and core aeration last year and will continue to cover the necessity for organic matter reduction in all of our turf grass playing surfaces here at Granite Bay. We plan to do more core aeration and thatch removal in 2011 along with a continued emphasis on irrigation management. Additionally we secured funding for extra hand watering personnel this Summer, along with funding for the irrigation enhancements that are currently under way, as well as extra funding for fungicide applications around greens to prevent  the southern blight disease that really hurt us last year. The due diligence that the golf committee is currently doing is  to help us with  planning for potential long range options for the course.

Bermuda fairways have always been a discussed option since many courses in the area play off bermuda and the "transition" area we live in can support both cool and warm season turf with advantages and disadvantages for both. The group played at Northridge in Sacramento and the newer Sevillano Links in Corning. The overall consensus of the group was that the firmer surfaces that bermuda generally provides in the summer was not a acceptable trade off for the conditions they exhibited in the winter when they were dormant. So discussions will go on covering other future options for the fairways at Granite Bay however we are hoping our 2011 plans will yield improvement. Our soil type and the varying populations of bentgrass and ryegrass have historically made this course a challenge to meet all of the memberships expectations in the  Summer. Will we have periods where we will tip one way or the other over the fine line between too wet and too dry? Probably. Will our efforts this year yield better conditions?  I believe so but time will tell.


Dormant Fairway at Sevillano Links













Dormant Fairway at Sevillano Links





Lastly I wanted to update you on some new things we have been talking about and will be out on the course soon. First the divot boxes I mentioned in our last update are almost complete. We secured delivery of the IPE wood that we are using for construction a little later then expected so we are a tad behind schedule but expect to have the par 3 boxes by the end of February. The 10 new divot bottles boxes will be out sometime in March as well as the matching IPE siding on the water cooler stations. Along with the new above mentioned  course accoutrement's we'll also be putting out new flags and new tournament flag sticks and cups very soon.



Routing and Assembling Divot Boxes


Completed Divpt Mix Box with Broken Tee Compartment











We are looking forward to a successful 2011 which will include the long awaited completion of our bunker project, resurfacing all remaining bentgrass tee surfaces and beginning the first phase of Granite Bays practice facilities improvement (much more to come on this). Our plans to facilitate overall improvement on the course this year come from past experiences as well as our sincere desire to respond to your needs and requests. 





 

Friday, January 7, 2011

Continued Wet, Winter Progress

It has been awhile since we have had a winter as wet as this one has been so far. The golf course is as soggy as it has been in many years and  those brave souls that have been out playing between and during storms know exactly what I mean. When a golf course gets saturated for an extended period of time you have to get a little creative just to maintain and mow it. We have been using triplex mowers, which are small mowers that we normally mow tees and sometimes greens with, to mow fairways. The large mowers that we normally mow the fringe grass around greens are far to heavy to use in these conditions so we have had to resort to using walk behind rotary mowers to get the job done.


Jogi Triplexing a wet Fairway















 
Fortunately the turf is not actively growing so the extra time it takes to get these tasks done with smaller equipment does not set us back. Normally when we get mowers out on the course we are able to allow carts off the path but that is not the case in our current situation. We are still far to wet for cart traffic.  If we were not afraid of the turf growth getting so far ahead of us that we would be "bailing hay", we would not even be mowing.  I can only imagine what it was like during past wet winters maintaining and maneuvering around this course without cart paths or for that matter maintaining the old bunkers. A nice reminder that   progress has been and is being made.


Hand mowing around the Greens







On a similar note the putting surfaces continue to drain and perform well despite all of the wet, dark weather. I attribute this to the aggressive core aeration that was performed in October and am even more optimistic that this new approach will give us the surfaces we desire. They are not as fast as they were in previous drier winters, but they are healthy and their root mass and depth is increasing. We could achieve more speed by rolling the greens but that would not be prudent in these wet conditions and I'm afraid would set-back the progress we are making. We are just going to have to be patient. Below are the current rainfall accumulations through December measured here at Granite Bay.
                  
              Granite Bay Golf Club - Rainfall Comparisons in Inches

                                                   2008          2009          2010
                        September           0.00            0.13           0.00
                            October           0.53            2.53           3.17
                        November           2.16            0.70           3.60
                         December          2.65            3.58            7.22
                             Total             4.81            9.94           14.00


Despite the wet weather we have been able to make good progress on the three major goals we have set for ourselves this winter. These three goals again are: Fairway Sand Trap Renovation, Tree and Brush Pruning and Trimming and Irrigation Triangulation around Greens.

Because the weather has been so wet we have not made the kind of headway on fairway bunkers as we did with finishing green side bunkers last winter but progress is being made none the less. We have been targeting small and non-draining bunkers because of forecasted weather patterns trying not to get caught mid process and having all of our work wash away. Since our last update we have only completed one additional fairway bunker, the one in the middle of #6. Then the December rains came and we had to back off. We had a dry week this week and jumped back into action, tackling the fairway bunker at the very front of the #17 fairway. This one was chosen primarily due to it's proximity to a cart path as the course is too wet to be tracking equipment across it to renovate bunkers. We hope to continue with the fairway trap on #18 next week if the forecast holds with another week of dry weather. If the course is still to wet to maneuver over to that trap we will tackle the fairway bunker closest to the green on #12. Once we commit to the right hand fairway traps on #12 we want to complete all three.


Completed Fairway Bunker #6



Completed Fairway Bunker #13
















Even though the wet weather of December stalled progress on fairway trap renovation we were able to continue progress on our tree and brush trimming list. We complete pruning of the obstructive willows and brush on the banks of Georges Lake between holes #1 and #9. This re-establishment of the original lines and view of your tee shot on #1 and approach shot on #9 was high on the golf committee list and confirmed with comments made by Kyle Phillips during our Summer visit. We plan to manage the re-growth of these areas so we maintain the current vision and eliminate the future need for aggressive pruning.


#1 Tee Before Pruning



#1 Tee After Pruning









Irrigation work around green surrounds is proceeding as planned and we have three more green complexes to complete on the front side. These are #4 which is currently in progress, #6 and #8. We should wrap this work up by the end of January and take the month of February and hopefully just part of March to complete the same kind of work on the back nine. Holes that need to be addressed to varying extents  on the backside are #10, #12,  a little more on #13, #15 & #16 and #18. Again this is not really sexy work but it will pay off in the summer months moving forward.

#9 Approach Before Pruning









#9 approach After Pruning



Speaking of a sexy project, we have one that we hope to completely have rolled out by springtime and that is additional divot mix boxes throughout the course. As you have probably heard, the Granite Bay Golf Committee is making a big push to encourage Granite Bay Membership to  take more ownership of certain aspects of course care, namely divot and ball mark repair. Ball marks have begun to be addressed with the committees "Adopt-A-Green" program that has been recently rolled out and is making a difference already.

When the discussion of imparting ownership to divot repair and filling it became apparent that the course had some infrastructure issues that needed to be addressed namely the location and amount of divot bottle boxes along with the complete lack of divot mix containers on our par three tees. These issues were brought to Mitch's attention and he secured some capitol finances and we are in the process of securing materials for building new divot boxes. We plan to build par three divot boxes for all par three tee locations and divot bottle stations which will house divot bottles for carts and the nice divot bottle tubes for walkers. We have decided to go away from the green recycled plastic and move towards natural hardwood as we feel that this is more of a aesthetic match for Granite Bay. We have chosen IPE wood, which is a hardwood out of the rain forests of Brazil that is weather proof and very attractive. Since all of our divot boxes will be made out of this material we plan to re-side our water jug stations with the same material maintaining this look throughout the course. We hope to have all 20 of the par three boxes in place  by mid February and shortly following have the 10 divot bottle boxes ready.



Friday, December 10, 2010

Early Winter Progress

We are all aware the weather plays a big part in golf course conditions along with the progress we make in golf course maintenance. Winter months are not nearly as stressful for the golf course as summer but cold and rain definitely effect playing conditions and hinder progress on  planned projects. So far this season we have received twice as much rainfall as we have the previous two seasons. More rainfall equates to more cloudy days and no sun to dry things  out which has the course in the wettest winter condition it has been in in many years. This week is the first full week in over three years that we have not been able to mow the course  and allow carts off the path because of conditions that are too wet. Extended forecasts call for a wetter then normal winter so if these prognostications hold up we could be in store for more of this.


          Granite Bay Golf Club - Rainfall Comparisons in Inches

                                                   2008          2009          2010
                       September           0.00            0.13           0.00
                           October           0.53            2.53           3.17
                        November          2.16            0.70           3.60
                December 10th          0.00            1.00           1.60
                             Total             2.69            4.36           8.38

The aggressive aeration that the putting surfaces received in October has really paid off during this wet early winter as well. The surfaces are firmer and drain much faster then in previous years after winter storms. However rolling the surfaces when they are wet creates excessive compaction which might work well for green speed but not for overall green health. So we have not been able to roll the surfaces since the onset of the storms. Look for green speeds in the nine foot to ten foot range when we are not rolling and in the ten foot plus range when we can sensibly get the roller on them, hopefully soon.


Despite the wet weather we have been making some decent progress on our 2010 - 2011 winter project goals since we finished core aeration of all of the turf grass surfaces in early November. As a reminder the three primary areas we plan to focus on this fall and the upcoming winter are:
          1. Fairway Sand Trap Renovation
          2. Tree and Brush Trimming and Clearing
          3. Irrigation Triangulation
Granite Bay has 21 total fairway bunkers and 5 practice bunkers between the range and the practice chipping area. Our plan for fairway bunker renovation is not as aggressive as last winter with green side bunkers primarily because we desire to make progress in the other areas mentioned above. We have currently completed 3 fairway bunkers of the 21. Our goal would be to complete another 10 or more through the remaining winter and tackle the rest after fall aeration in 2011. I probably don't need to remind you that weather plays a significant role in the amount of progress we can make with this type of work and although we accomplished allot last winter dealing with just normal rainfall it looks like weather will be more of a deterrent this year then last. We'll just have to work between storms and see how it goes. In addition to the bunker work planned this winter, we hope to finish the practice bunkers around the chipping area later in the year when we have some renovation work planned for the entire area.  More on this to come.


#2 fairway Bunker Complete

#2 Fairway Bunker Drainage Pattern










#13 Left Hand Fairway Bunker - Completed

As I mentioned in the last update we have a substantial amount of tree and brush clearing we hope to take care of this winter as well. The Granite Bay Golf Committee came up with a list of areas that were priorities for the membership and we plan to tackle many of these areas. However as I mentioned in our last update, we need to open up some areas around greens providing more light and air movement to help with the overall health of these areas. These struggling areas  include the practice green, #7 green, #13 green, #14 green and #16 green.
Practice Green After Pruning

Practice Green Before Pruning

#7 Green after Pruning. 7:00 AM Picture

Since our last update we have completed tree pruning around the practice green, #7, and #16. We have started and plan  to complete the pruning around #13 and #14 next week and then start on the Golf Committee list ,starting with  the willows in the pond on #1 & #9 that are blocking the vision of those two holes. While we are in the area we  plan to start clearing in front of the #10 tee exposing the granite rock formations and returning the appearance while standing on the tee to more of the original vision and intent of the hole. We plan to take the last three weeks of December and beyond, if that what it takes to accomplish all of this work.



#16 Green Surround After Pruning

Irrigation triangulation is just a fancy way of saying we need to move some sprinklers so they can be more efficient when we start irrigating next year. We understand that this work is not as  impactful as exposing the rocks in front of #10 tee or pruning trees around the greens,  I only mention it to emphasize its importance. It is tedious and time consuming work albeit necessary and we don't want to start irrigating next year without completing all of it. So when you see us out there trenching, digging and making a mess around the greens just be assured that this work will help  create better conditions next summer.

Monday, November 15, 2010

Winter Plans

We are wrapping up core aeration of all of the playing surfaces at Granite Bay this week. If it seems like we have been working on aeration for awhile  its because we have. This is the first time since my tenure here at Granite Bay that we have taken the time to core aerate all of the turf at one time. As I have explained in the past, core aeration involves not just poking a hole but extracting a core and removing it  from the surface as opposed to solid  tine aeration where a hole is made in the surface of the turf but no core is removed. Both processes have different benefits. Core aeration is more disruptive and labor intensive but actually removes a portion of the   accumulated organic matter or thatch. Solid tine aeration supplies necessary oxygen to the root zone, as does core aeration, but does not address removal of excessive organic matter which is a real issue  here at Granite Bay. However the process is less labor intensive allowing us to get more done in a shorter period of time and the surfaces recover more rapidly.


Core Aerating around #16 green
 
Fairway aerator removing cores from fairways




We got started in September in the rough on some holes trying to get a head start and keep disruption to a minimum. An unseasonably warm early fall caused us to hold off a bit as any type of aggressive cultural practice such as core aeration during stressful weather can actually set the areas back rather then the intended improvement. Aggressive core aeration of the putting surfaces was performed in early October and the unseasonable weather continued and actually helped us with rapid recovery on the greens. Following the greens we completed fairways, then resumed the rough areas followed by the approaches to the greens and now just finishing the surrounds of the greens.

Seeding thin areas in the rough on #13


 The process requires some drying to both remove the damp messy cores and to get topdressing sand into the holes where sand was applied. Putting surfaces were done on days when we closed the course and the majority of the fairways were done on subsequent Monday afternoons following tournament events. The rest of the areas were done systematically during member play  by doing the actual aeration or core removal in the morning, allowing for some drying followed by removal of the cores and applying topdressing. Thanks to all members who put up with the disruption and noise during these processes. Bottom line these necessary procedures to the entire golf course take the better part of two months to accomplish. Core aeration along with normal golf course maintenance is all we can accomplish during this period of time.

Which brings us to whats next? What are our plans for this coming winter? We always look forward to the winter months because with any kind of luck and cooperation from nature we can get allot done. There are three primary areas we plan to focus on this fall and the upcoming winter.
  1. Fairway Sand Trap Renovation
  2. Tree and Brush Trimming and Clearing
  3. Irrigation Triangulation
Starting next week we plan to start the renovation process on our fairway sand traps. Our plan is to use the same drainage system in the base of the sand traps and not extend the drainage into the faces of the traps as extensively as we did on the green side traps. This should allow for a consistent firm face of the trap and minimize the depth of sand on the face and maximize ball settling into the base of the trap. The faces of the fairway traps will probably washout more readily then the green side bunkers but  the traps will not be able to hold water in the base which is currently not the case. The totality of this final phase of bunker renovation will play out similar to last year. We have some capitol funds left from 2010 that we need to use by year end. That is what we will start with. If our capitol allotment for 2011 is approved early and weather cooperates we will continue through the winter of 2011.


#7 green shaded in the morning
                                                                                     Also next week we plan to start brush clearing / tree pruning in areas  that we did not make as much progress as we wanted to last  winter  because we put all of our resources into finishing green side bunkers. This work will be very visual and dramatic for all of us so we are excited about getting started. First things first, we have to address some green surrounds which tree growth and the associated shade are effecting turf quality on the greens. Greens surrounds that we plan to address in the next couple of weeks are: Large Practice Green, #7, #13, #14 & #16. Following the trimming around these greens we plan to start trimming the Arroyo Willows ( grayish colored shrubby willows) on the pond edges of #1 & #9 along with associated vegetation. Our goal is to maintain the natural look of the pond while re-establishing the original vision of the initial tee shot on #1 and the approach shot on #9. Following this area we plan to attack the area in front of #10 tee, again re-establishing the original vision of the hole and exposing much of the dramatic granite rocks in front of the tee. Another area we would like to address this winter is in front and around the #14 tee.


Practice Green in complete morning shade
 The third of our three goals for this winter is to continue to work on irrigation sprinkler triangulation improvement focusing on putting surface surrounds. You will have to trust me that this work will make a substantial difference in turf quality in these areas, improving irrigation distribution and enhancing irrigation management and scheduling efficiencies. I don't want to bore you with the details but again want to reinforce the importance of this work and our commitment to getting putting surface surrounds addressed this winter.

Current view from the granite tees on #1



Current view from granite tee #10




As we progress through these goals I will share details with you as usual. Weather always plays a big part in progress at this time of year but we will hope for the best and  see how much we accomplish come spring time.



Friday, October 22, 2010

Granite Bay Tees

Any one who has been a member of Granite Bay Golf Club for any length of time recalls our original tees and how we have been painstakingly replacing the original turf on them throughout the years. Newer members might be wondering about the inconsistencies in firmness versus softness and why some of them look just awful. This update will address all of these issues and let you know both the short and long term  plan for fixing them.

Our tees were originally seeded with creeping bentgrass which is a cool season grass commonly used for putting surfaces in our area. Not many courses in our area, none to my knowledge, started with bentgrass on their tees. This is  primarily because of the  intense maintenance requirements  for bentgrass and it's inability to recuperate on a teeing area  during the summer months. In the early years of the club it was nearly impossible to keep grass on some of the tee's during the warmer parts of the year as any charter or long time member can attest. Because of this, the decision to replace the bentgrass was a given.



Newly Sodded Club Tee on #12

This decision was made almost 12 years ago but back in those days allot was going on. The Club was going through a management transfer from the original ownership group to Club Corp and the members had a lot of pressing issues such as lack of grass on the greens, lack of cart paths etc. When it came to the tees, turf replacement started with the very worst areas and then progressed as other teeing levels took their place in the infamous pecking order of "next worst". It was not one big capitol project for there were many other needs vying for those precious capitol funds. The replacement sod was purchased through the maintenance budget as areas became unacceptable. Currently we have re-surfaced close to 80% of all the original bentgrass teeing areas on the course.

The replacement turf choice was a variety of hybrid bermuda called Tiffway II. This is a warm season, fine textured hybrid bermuda that produces a durable, firm surface with a high recovery rate ideal for  teeing areas. The new hybrid bermudas have a much better cold tolerance then their Great Grandfather common bermuda allowing them to hold on to color longer and come out of dormancy quicker. However dormancy of the bermuda was never going to be a big issue on the teeing areas  because the plan was to always over seed with ryegrass in the early fall, allowing them to be green all winter long.



Installing New Sod #6 Club / Cobble / Pebble Tee's
We are currently dealing with some of those "next worse" tees.  The Cobble tee on #2. The combo Club, Cobble & Pebble tee on #6. The Club tee on #12 and the Cobble tee on #17 are all currently being re-sodded. This leave us with only 22% of all of the teeing areas left on the course to re-sod. Our plan is to next year utilize a combination of sprigging and sodding of the remaining tees bringing some closure something that was started long ago.

#6 Club / Cobble / Pebble Tee in need of new turf.


Thursday, October 7, 2010

Fall 2010 Aeration Progress

Anyone who has ever spent any amount of time on a golf course will inevitably be confronted with the  process of aeration to the turfgrass playing surfaces. There is some truth to the appearance that it always seems like we pick the most inopportune time for golfers, either in the springtime coming out of winter, or in the fall  when summer recovery is in full swing. Unfortunately  the simple truth is  that these procedures  have to be done while the turf is actively growing so the surfaces can adequately recover.

In turf, aeration is a cultivation process that provides for air to move or circulate in the root zone and soil. Air in the soil is necessary for most of the  turf grass plants basic functions and we can trace many of our turf problems here at Granite Bay to a lack of air in the root zone. Aeration also relieves soil compaction and when done by pulling a core, the process can be the most effective way of removing excessive organic matter or thatch which actually seals off the soil from air infiltration. Our overall problems will  only compound if we are not diligent at sticking to a routine aeration program on all of the turf areas here at Granite Bay.



#3 Green being core aerated.



Organic matter (we call them plugs) removal


We just finished aeration of the putting surfaces utilizing a more aggressive approach then has ever been applied to our greens. Over the years our greens have become soft and spongy which is a result off a over accumulation of organic matter otherwise known as thatch. The USGA states "In our experience, golf courses with successful mature greens have been on a core aeration program where 15% to 20% of the surface area has been impacted each year."  (USGA Green Section Record - Core Aeration by the Numbers July 2001) The greens at Granite Bay have been aerated twice per year since their inception. However we have typically impacted only 10% to 12% of the surface per year utilizing a minimal disruption aeration approach. hence the problems we had this past summer and our adopting recommendations by the USGA.



Total material removed from 2 greens, #10 & #11

Applying topdressing sand


Finished after brushing, sweeping, blowing and rolling


Organic matter is not just an issue with our putting surfaces. It has accumulated throughout the course and is the source of our soft conditions. The removal of it via core aeration and de-thatching is tedious and time consuming work that need to be done in a timely fashion so the surfaces recover as quickly as possible. Again as I mentioned above if we don't stay on a annual regimen of core aeration of all of our playing surfaces twice per year, our soft and mediocre conditions can persist. It is definitely one of the  necessary evils of golf course maintenance

Putting surfaces were completed the week of October 4th. Front nine fairways will completed the week of October 11th, back nine the week of October 18th along with the back nine rough. That leaves us two weeks to address the putting surface surrounds which we plan to core aerate and aggressively seed.