Thursday, March 23, 2017

Updated Fairway Aeration Schedule

Successful Putting Surface Aerification Monday 3/20/17

In the two previous course updates we chronicled changing our previously scheduled greens aerification from Tuesday 3/21/17 to Monday 3/20/17 due to wet weather forecasted  for the aerification day. We started The Greens Aerification Process around 5:00 AM and finished 1-18 regulation greens as well as the chipping green and both practice putting greens by 3:30 PM. Moving the date seemed almost providential because not only did it start to rain shortly after we completed the process, we literally had no issues with damage, or equipment or man-power. I've never experienced such a smooth process, here at GBGC nor anywhere else, and there is allot of equipment and moving parts involved. Thanks to our entire maintenance staff and in particular, Kevin Schumann our Equipment Manager who made sure everything was working tip top. 

#18 Green aerified the day before getting rained on Tuesday 3/21/17

As I mentioned above it literally started raining when we finished and continued to rain off and on for the next two days ( Tuesday and Wednesday) and nights giving us a total of 1.70" of rain. This is extremely good for the greens after aerification as it helps work the sand into the holes and draws oxygen deep into the green soil profile. The down side to the wet weather is we cannot what I call "tweak" the greens by spot sanding & brushing areas that have settled as it is imperative that this is done in dry weather. Today is nice and as I am writing this correspondence to you, the crew is out working amongst some of you and rolling, lightly sanding and brushing to make sure all of the holes are filled. This again is being done right ahead of another rainstorm later tonight ( Thursday ) and into tomorrow ( Friday ). Perfect.


Jogi adding a little extra sand to fill up settled aerification holes

Brushing to fill up the holes


Fairway Aerification Plan

We have been able to time rain events with the greens aerification this time around but I suspect the fairways will be too wet to core aerify next week on our planned alternating F9 / B9 closure days scheduled for Tuesday 3/28/17 through Friday 3/31/17. We will wait and see what nature brings us as far as rain is concerned the next few days and make and communicate our decision by Saturday or Sunday. If we are not able to go on the planned dates we will re-evaluate our process doing something that will not require F9 / B9 closures. More to come.


Updated rainfall amounts we received right here at GBGC. Almost 35", more then 10" over normal and it's not done yet.






Friday, March 17, 2017

Updated Greens Aerification Schedule

Spring 2017 Greens Aerification will be on Monday 3/20/17


The below chart indicate's a change from this AM in the weather forecast. This Accuweather forecast now is in alignment with the Weather Channel forecast giving us some added confidence to confirm the above Monday 3/20/17 putting surface aerification date. It took more then the weather forecast to change to get this done. Mr. Peabody had to get clearance to reschedule an already scheduled tournament on Monday 3/20/17 and move  them to another club. It took some doing but he found another sister club in the area and hopefully everyone will be happy. Always looking out for the big picture which is our GBGC Members, Michael comes through again.    


Getting the  regulation greens aerified  and on the path to healing is our main goal next week. If the amount of forecasted rain materializes, and that is a big if, we will not be able to aerify fairways. We will communicate what is going on with the Fairways as soon as we know. 

Thanks for your patience and Thanks Mike!

Wet Weather and Turfgrass Aerification

Planning GC Maintenance Practices Around Rain

We changed our start date for spring aerification a few years back from early April to late March with the idea that we would be recovered and in good shape earlier in the golf season. The last few years were much drier then this year so the calendar change worked out well. Currently this year is looking like a different story with wet weather forecasted for the upcoming week, Monday 3/20 through Friday 3/24.



As you can see the above forecast from this mornings Accuweather report, we have rain coming on the dates we slated for aerification. Why is this important? Because this kind of work cannot be done when it is raining or even too wet. Trust me we have tried, and we end up making more of a mess and damaging the very turf we are trying to improve with aerification when we try to do it in the rain or overly wet conditions.

We are ready to go and will be watching weather and forecasts closely and if we feel we can proceed with out causing damage we will do so. There has been a slight change in this forecast from yesterday to today calling for less rainfall on Tuesday and more Monday night. Tuesday is when we are scheduled to do greens which are a little more conducive to aerifying when everything else is wet because of their high sand content but it is still iffy with over 1/2" forecasted for Monday evening. It really depends on when that 1/2"+ falls. 

Bottom Line

We are leaning towards postponing all aerification practices until the week of Monday March 27th. If we can get the greens done on Tuesday 3/22/17 as planned we will as we will get another week of recovery which is advantageous to the big picture. If its too wet we will postpone greens until Monday 3/27/17. If it is dry enough we will aerify fairways the following Tuesday 3/28/17 through Thursday 3/30/17 with alternating F9 / B9 closures on those days. If it is too wet to aerify fairways during that time frame we will reevaluate our process and timing.

Winter Wrap Up

Below are current images of where we are at with rainfall totals, CA reservoir levels and snow accumulation. We are in pretty good shape for 2017 so I wont be writing too much about drought, however as I have stated before water and water use are obviously important to golf course turf and will, I believe, the defining issue in CA golf moving forward.



GBGC Rainfall YTD rainfall accumulation from 1/1/2005 through 3/17/17.
Folsom Reservoir, the reservoir that is nearest and dearest to our heart as it supplies all of our irrigation water, has been on a wild up and down path this year. First and foremost it is a flood control reservoir for the American River watershed and it's releases have reflected that purpose.
Best way to store water is in the mountains as snow and thankfully we finally got  some in 2017.
Another thing to be thankful for. The whole state is in good shape this year as far as surface water and snow are concerned however aquifers are still depleted and in a precarious position. We still have work to do with CA water infrastructure.











Friday, February 17, 2017

Golf Course Maintenance Weekly 2/17/17

What To Do When It Doesn't Stop Raining?




You might have wondered what does the golf course maintenance staff do when all it seems to do is rain like it has been doing since the beginning of the year. Its too wet to mow or even get maintenance equipment out onto the golf course to dig drains or spread sand or do anything you might be thinking. Its true there is allot of normal maintenance activities that we cannot do when it is raining or sloppy wet as the course has become this winter, but we have stayed busy and productive setting ourselves up for success this spring when it finally stops raining. Below are some pictures of our recent progress on a couple of fronts.



The best time to do tree pruning for us in in the winter months and as long as it is not raining too hard we can make progress in the rain. Above is GCM working on trees along left hand side of #18  recently.  Below is the area between #14 green and #15 tee that needed some pruning making the fairway from the upper tournament tees more visible.






Irrigation Controller Install

Another project we have been working on is  Phase II of our Irrigation Controller Replacement. Rainy weather has hindered our progress but we have been diligent to work between storms to get this important project complete. Replacing our irrigation controllers (those grey boxes spread out around the course) not only proactively replaces 20 year old electronics, but also gives us more pin point irrigation control because we can add stations and split up sprinkler heads. This "single head coverage" allows for a better distribution of irrigation water leading to better turf conditions.



                                           Preparing for new concrete pedestal


                                                                                    Sometimes improvisation is necessary when the rain just                                                                             wont stop



Pouring concrete between storms





                                         Finished Product

Between the Storms

When it stops raining and we look forward to our Members returning to the course we have to recover the sand traps from the previous rainstorm. Of course not all rainstorms are equal. Heavier rain that falls quickly usually causes the most wash outs and damage. Lighter, sustained rain gets and keeps everything wet, but is less likely to wash out the traps.


This is the results of a heavy storm



                                                         Bring out the pumps



Enrique pushing up the wet displaced sand before raking.



The Rising Creeks


When it rains of course, the creek rise. Below are some pictures of Linda Creek running through the course directly after a heavy downpour.




Linda Creek entering our property near the bridge on #4




Linda Creek running into our irrigation pond just behind #4 green.



Linda Creek exiting our irrigation pond under the bridge on #1



Subsurface drainage sheeting across the turf and dumping into Linda Creek near the bridge on #16 & #15



Linda Creek running right in front of #16 green.



The other side of the bridge on #16. Notice the accumulation of azolla  (red floating mat that was in the main irrigation pond between #1 & #9). Good riddance.













Monday, February 6, 2017

Golf Course Maintenance Weekly 2/7/17

Leaning Digger Pine

In the southwest corner Granite Bay Golf Club there are, or at least there used to be, a couple of 60 foot high Digger Pines (pinus sabiniana). One of these pines in particular is leaning towards Roseville Parkway and if it did fall with all of the wet weather we have been having it, would fall across Roseville Parkway and I don't need to tell you what kind of problems that could cause.


The two questionable Digger Pines in relation to the
 saturated slope & Roseville Parkway

The west side slope

Another angle depicting the lean towards Roseville Parkway

Digger Pines do put down a tap root to draw water from deep in the soil which is why they survive in our dry climate. This tap root, along with conducting water for the trees survival, stabilizes the pine tree and is likely what has kept these trees from falling over years ago. However the soil on the west side of these trees was cut years ago during the construction of Roseville Parkway I suspect and with the recent rains softening the soil around the trees base a consulting arborist recommended their removal.

Tree crew on the job this morning Monday 1/6/17

Thursday, January 26, 2017

Golf Course Maintenance Weekly 1/25/17

Historic Winter

Although it's been awhile since we have published a course update, allot has been going on, most of it weather related. Below are rainfall totals measured right here at the golf club by our on course weather station. As you can see  during our current rainfall year in which the data is measured from October through September, total accumulation YTD is just under 23". Average historic rainfall for our area is 24" so we are only 1" below average with February and the spring ahead of us. Additionally two of the four rainfall months in 2016 - 2017 have #1 rankings. October 2016 was a historic month State wide for rainfall and we measured just under 5-1/2" by far the most measured ever at GBGC for the month of October. I don't know if January rainfall accumulation will be a record for the State but the 10-1/2" accumulation measured here at GBGC is another record for us.
An article in the Sacramento Bee this morning (1/25/17) conveyed the reasons why with all of this rain the reservoir is half full. Bottom line it is a comparatively small reservoir that is fed by a substantial watershed and the reservoirs primary purpose is flood control for Sacramento. The up and down graph has us currently below historic average however the best news for the reservoir that supplies all of our summer irrigation  is the snow accumulation in the North and Central Sierras.


The month of January changed the below snow map almost overnight. This will be the water that will fill Folsom reservoir hopefully to the top by June. 

State wide the reservoirs are looking very good as one would expect with the rain we have been receiving. It will be interesting to see how the State proceeds with drought regulations and such this year although water conservation is the new normal in CA despite all of this wet weather.  



Wondering How The Golf Course Handles All The Rain?


Recent storm just getting started on #3 green.
For the most part all of the rain we have received has been fallen fairly steady with very few heavy downpours. Areas that are covered with turf handle even large amounts of rain very well, even downpours. Sand traps are another story. Our traps can handle steady rain pretty well but downpours wash sand off the faces of the traps and have now started to undermine the liner and sub surface base of these faces in a few areas. When we do get sustained rainfall there is allot of recovery that takes place in the sand traps afterwards which is just part of the job. Depending on the severity of the washouts it could take over a hundred man-hours to recover all of our sandtraps after a good rainfall, and close to 200 man hours after a severe downpour. So far this year we have had to do plenty of recovery but have avoided those serious downpours that makes our life difficult afterwards.

Fairway bunker on #9 after a recent storm.
Recovery in process


On rare occasions usually after a good rain event we have some visitors that come to play and dry out. These are two North American River Otters . River Otters are spotted occasionally here at Granite Bay but they don't stay long.

Friday, November 4, 2016

Golf Course Weekly 11/4/16

Perfect Fall Weather

I have shared many many times about the Fall Equinox being a key time for our golf course and this year above all others have illustrated why we in golf course maintenance look forward to it.  The turf conditions at Granite Bay are currently as healthy as they have been after the summer season and midway into the fall. Part of these conditions are due to added resources in our golf course maintenance program in 2016 that helped to prevent summer cool season turf thinning and losses. Another contributor is the absence of severe drought restrictions this year. However the weather during the month of October has been PERFECT for the recovery and further establishment of cool season turf and again is evidenced by the thick and dense turfgrass conditions we are experiencing. 


Thick conditions on #12 resulting from a perfect storm of seed, rain and mild temperatures.

Rainfall is a large part of the October weather we've experienced this year and the local accumulation is by some accounts historic. The last12 years of  rainfall data accumulated by our own weather station here at GBGC shows we received 5.48" of rain in October, the most we have received in October, ever. This rainfall, combined with earlier in the month aerification, the application of over 8 tons of ryegrass seed and  high temperatures in the mid 70's and lows  in the mid 50's, created the perfect storm for some thick and lush turf. No one is complaining, however it was a bit of a challenge to get the course mowed down and playable prior to the Jones Cup on November 3rd and 4th. Forecast for the first part of November is dry with temperatures remaining in the high 60's and low 70's as well as night time temps in the 50's. This means we have more thick turf in our future but drier and better playing conditions.